Contact our team today for a free project consultation. Let’s tailor a solution that fits your mining, recycling, or aggregate needs. Partner with XINJINSHAN, and unlock your project’s full potential!
Our Products
Long Distance Conveyor
The long – distance conveyor is a crucial equipment for transporting bulk materials or finished products in scenarios like mineral separation. It finds extensive application in industries such as mining, metallurgy, and coal.
Our long – distance conveyors come in various types to meet different needs, including semi – enclosed long – distance conveyors, special – structure long – distance conveyors, closed – type belt galleries for sand and aggregate, and long – distance belts for sand and aggregate.
China's leading manufacturer of industrial intelligent equipment
Our Products
Product Introduction
The long – distance conveyor is a crucial equipment for transporting bulk materials or finished products in scenarios like mineral separation. It finds extensive application in industries such as mining, metallurgy, and coal.
These conveyors boast numerous advantages. They have a large conveying capacity, a simple structure, and are convenient to maintain, with standardized components. Depending on different technical requirements, they can be used alone, in multiple units, or in combination with other conveying equipment. Also, they can be installed horizontally or at an incline to fit various production lines.
Semi enclosed long-distance conveyor
Semi enclosed long-distance conveyor
Closed belt Gallery of sand and aggregate
Long distance belt for aggregate
Specifications
Specifications: | |||||||||
Layers (m) | Transferring Length (m) | Belt Width (m) | Freight Volume (t/h) | Belt Speed (m/s) | Motor Power (kw) | Lifting Height (m) | Steel Rope Core Tape | ||
|
|
|
|
| head | end |
|
| |
Single Layer | 5000 | 1.2 | 1200 | 3.15 | 2*500 | 500 | 16 | ST2000 | |
| 6000 | 1.2 | 2000 | 3.15 | 2*450 | 450 | -87 | ST1250 | |
| 9000 | 1.4 | 2500 | 4 | 3*800 | 800 | -31 | ST2500 | |
| 10000 | 1.6 | 3500 | 3.5 | 800 | 2*800 | -485 | ST4000 | |
| 1100 | 1.2 | 1250 | 4 | 2*800 | 800 | -42 | ST2500 | |
Bilayer | 1570 | 1.4 | 3600 | 4 | 2*800 | -141 | ST2500 | ||
| 1610 | 1.0 | 1000 | 3.15 | 450 | -147 | ST1600 | ||
Model (m) | Transferring Length (m) | Belt Width (mm) | Freight Volume (t/h) | Belt Speed (m/s) | Monolayer area (kw) | Lifting Height (m) | Steel Rope Core Tape | ||
|
|
|
|
| head | end |
|
| |
Piping Belt Conveyer | 4700 | 500 | 2000 | 3.15 | 2*630 | 2*630 | -102 | ST2500 | |
| 5500 | 500 | 2000 | 3.15 | 2*710 | 2*710 | -106 | ST3150 | |
Our Cases
Related Cases
Discover how we've solved similar challenges for other clients
Benchmarks of Excellence in Every Aspect
Project Location: Shenshan, Anhui Province
Production: 70 million tons per year
Project Description:
The Shenshan limestone mine's product plan is primarily building stone, supplemented by cement stone. A stone production line with an annual output of 70 million tons will be established, leveraging the Yangtze River's prime waterway. Finished building stone will be processed at the mine site and shipped via the Yangtze River for sale to the construction materials market in the Yangtze River Delta and downstream regions.
Shandong United Wangchao Cement 1000TPH Sand and Gravel Aggregate Production Line
Project Location: Zaozhuang City, Shandong Province
Production: 1000-1200 tons per hour
Project Description:
This project, using the Xinjinshan EPC general contracting method, will construct a 1200-ton-per-hour short-process sand and gravel production line with a single output. The entire production line will have a 7.5-kilometer long-distance conveying process and a construction period of six months. This will be an energy-saving, environmentally friendly, high-end, intelligent, green, and premium sand and gravel aggregate production line.
Henan Yuzhou Guotai Building Materials 3000TPH Premium Aggregate Production
Project Location: Yuzhou, Xuchang City
Production: 3,000 tons per hour / 10 million tons per year
Project Description:
The Guotai Building Materials production line has an hourly output of 3,400 tons. The two sides will also deepen their cooperation and expand their scope, jointly promoting the construction of a new building materials industrial park, and transforming the production line into a national green mining demonstration base, thereby promoting the development of the sand and gravel industry through concrete actions.
Our R&D Journey
Driving Innovation, Shaping the Future
We are committed to exploring cutting-edge technologies and providing strong support for product innovation.